Project Gallery To View our Gallery of Videos from Facebook, please click here Burlington Plumbing and Heating » laheyExisting watts 21/2” 909 was in tough shape.247254230_3940559452712957_7836873442158378755_n247264635_3940559439379625_6014170843318489064_nWe had to mearsure the spread to see if we could install our two 2” RPZ’S.247238724_3940559436046292_2108608702893735156_nINSTALLED TWO FEBCO 2” 825YA’s with soft seated cone checks on both sides of the bacflows.247292006_3940559672712935_1661440935559859127_n246918234_3940559842712918_720394684732472704_n247187234_3940559932712909_2305696577903695521_nThe finished product with the drains complete.247240710_3940560049379564_133875557561762482_nWe kept the upsteam gate because they could not find another isolation valve.247256377_3940560142712888_6654016502303388849_nWe took out an old RPZ and installed this Febco 2” 825YA with soft seated cone checks on both ends.There is a considerable amount of flucuation in the water main in the hospital. They don’t 100% solve the issue but make it managable.247210281_3940560192712883_1212447127716558650_n Contact Us [recaptcha]